Incorporated on 10 September 2020 and based in Miri, Sarawak, Halinet-Link carries a project record that runs back to 2009 through the team behind it — from 33kV submarine power cable laying in Thailand to fibre and structured cabling for Malaysian federal departments.
Diperbadankan pada 10 September 2020, beroperasi dari Miri, Sarawak, dengan rekod projek pasukan sejak 2009.
To be a premier Information and Communication Technology industry player, and a provider of human capital training and development in the country.
To lead in distributing, installing and upgrading ICT components and equipment, while developing skilled and semi-skilled people able to meet the demands of a multi-sector industry.
Lima bidang perkhidmatan, satu pasukan pelaksana — dari perundingan sehingga sokongan teknikal.
Scope definition, route survey and technical advisory ahead of award.
Fibre optic, UTP and structured cabling — supply, install, test and commission.
Power and composite cable laying, burial, jointing and repair offshore.
Bringing cable plant, active equipment and security systems into one working network.
Preventive maintenance, fault response and client training after handover.
Senarai projek lengkap 2009–2024. Rujukan pelanggan boleh dibekalkan atas permintaan.
| No. | Year | Project | Discipline |
|---|---|---|---|
| 1 | 2024 | Labour charges for fibre and UTP installation at MRSM Bintulu, Sarawak | ICT & fibre |
| 2 | 2024 | Supply and install fibre optic and UTP cable at Jabatan Kimia Malaysia, Kota Kinabalu, Sabah | ICT & fibre |
| 3 | 2024 | Supply and install fibre optic and UTP cable at Jabatan Kimia Malaysia, Kuching, Sarawak | ICT & fibre |
| 4 | 2024 | Perolehan perkakasan, perisian dan rangkaian bagi MRSM Bintulu, Sarawak | ICT & fibre |
| 5 | 2022 | Delivery, installation, testing and commissioning of 48C ADSS fibre optic cable (25kV anti-tracking), Selangau 275kV to Tatau 275kV substation — 88.5 km | Power & transmission |
| 6 | 2024 | Perkhidmatan menaik taraf dan menyelenggara sistem kabel rangkaian setempat (LAN), Jabatan Kimia Malaysia, Sabah dan Sarawak | ICT & fibre |
| 7 | 2024 | Upgrading of fibre optic cable, accessories, training and maintenance at TLDM Sepanggar, Sabah | ICT & fibre |
| 8 | 2023 | Engineering services — CommScope Cat6 cable laying, PVC conduit routing and civil works | ICT & fibre |
| 9 | 2023 | LAN cabling work at JPJ office | ICT & fibre |
Project photography — drop images to fill. Gambar projek: seret imej ke dalam ruang di atas.
Cable handling, burial and diving equipment held in-house, so mobilisation is not dependent on third-party hire.
Projects delivered across East and Peninsular Malaysia and in six Thai provinces.